LogoLogo
  Logo
   
  Search
   
  Home
  What's New?
  For Sale
  A History
  Technical
  Stories
  Forum
  Email List
  Members Only
  Links
  Marine Weather
  Local Weather
  Roster
  Contact Us
   
   
Underneath the V-Berth - a Project  
   

May 17, 2010. Jim Robinson, Aquila, Pacific Dolphin #273 sent in the following improvement project for below his v-berth/forepeak.

Forepeak Project

 

 

The previous owner had replaced the water tank and holding tank in the forepeak.  He gained the needed access by cutting out a large section of the liner as seen above.  He covered the cutout (and entire forepeak) with ¾ inch ply.  I wanted to stiffen the boat and install something a bit more complete looking yet removable for access to the hull area.

I reinforced the edges of the cut with 2X3 redwood pieces, then overlayed with redwood planks, screwed in and easily removable and covered with marine ¾ ply, set with screws.

This is the finished project.   Next: Install a vent panel beneath the teak coaming.

 

 

 

 

 

 

 
   
1
1 [Home] [A History] [Technical] [Restorations] [Stories] [Forum]
[Members Only] [Links] [Marine Weather] [Local Weather] [Contact Us]
 

© Copyright 2007. All Rights Reserved.

Website Design by EasyWebCreations.com & Powered by ASP Hosting